Menu Close

With one down, Klamath dam removal proceeds on schedule

With one down, Klamath dam removal proceeds on schedule

The first of four hydroelectric dams along the Oregon-California border has been removed from the main stem of the Klamath River. All that remains of the dam known as Copco 2 in Siskiyou County, California, is the headworks of a diversion tunnel adjacent to the now free-flowing river. “As little as a month ago, it was a 35-foot concrete dam that spanned the entire width of the Klamath River right there,” says Mark Bransom, CEO for the Klamath River Renewal Corporation, which is overseeing dam removal.

Link: With one down, Klamath dam removal proceeds on schedule
via oregonflyfishingblog.com

Visited 1 times, 1 visit(s) today
Posted in Environment, Headlines

Recent Related Stories